ZGA was retained by the Idaho Army National Guard (IDARNG) Real Property Master Plan which was accomplished in two phases. Phase 1 involved collection of and produced maps and construction standards in order to capture existing conditions for future land development and construction needs. An existing conditions map with a summary and installation design guidelines that included construction standards for the State of Idaho, Army National Guard was created.
Phase 2 - Finalized the Master Plan Report and an included a tabulation of all existing and required facilities, future development plans, project phasing maps and environment consideration document.